How to Choose a Farm Battery Installer in Scotland
Quick answer
How do I choose a farm battery installer in Scotland?
Choose an installer who works through MCS-certified partners, surveys your farm before quoting, provides an itemised quotation listing every component and cost, handles DNO paperwork and explains warranty and backup options. Get two or three quotes and compare what is included, not just the price. We install through MCS-certified partners across Scotland.

What are the key facts?
- We install through MCS-certified partners
- Every farm is surveyed before a price is given
- Itemised quotation lists battery, inverter, labour and DNO paperwork
- DNO notification and applications handled by the installer
- Get two or three quotes and compare what is included
- Interest-free credit up to £30,000, subject to status
Last updated: 11 November 2026
Choosing the right installer for a farm battery storage system is one of the most important decisions in the process. A good installer surveys your farm, designs the system around your actual loads and supply, and gives you an itemised quotation so you know exactly what you are paying for. This page explains what to look for and what questions to ask.
Why does MCS certification matter?
MCS certification indicates the installer meets recognised standards for the design and installation of renewable energy systems. We install through MCS-certified partners who work to current wiring regulations and DNO requirements. Your installer handles the survey, design, installation, commissioning and the paperwork your network operator needs.
Should I get more than one quote?
Yes. Getting two or three quotes is sensible for an investment of this size. Compare what is included, not just the total price. A proper quote should list the battery capacity, inverter type, backup capability, electrical upgrades, DNO paperwork and installation labour separately. If a quote is a single figure with no breakdown, ask for the itemised version before deciding.
What should an itemised quotation include?
An itemised quotation should list:
- The battery make, model and capacity
- The inverter type and whether it is hybrid or standalone
- Installation labour and estimated timeframe
- Any electrical upgrades to your distribution board
- Backup circuit work, if included
- DNO application or notification costs
- Any other costs, such as cable runs between buildings
If any of these are missing, ask why. A quote that leaves out electrical upgrades or DNO paperwork may look cheaper but cost more once the work starts.
Do I need a survey before getting a price?
Yes. A proper survey checks your supply type, distribution board, existing solar and inverter, building layout and the loads you want backed up. Without a survey, any price is a guess. Farms vary too widely in wiring, supply and equipment for a standard package price to be reliable.
What questions should I ask a farm battery installer?
- Are you MCS-certified, or do you install through MCS-certified partners?
- What experience do you have with farm installations specifically?
- Is the quotation itemised, and can I see the breakdown?
- What backup capability is included, and which circuits does it cover?
- Who handles the DNO paperwork?
- What warranty does the battery and inverter carry?
- Is finance available, and what are the terms?
How do I arrange a survey?
Fill in the quote form on this page or call us on 0141 230 0198. We arrange a survey through our MCS-certified partners and send an itemised quotation with no obligation to proceed. For more on what drives the cost, read our cost guide. For more answers, visit the Scottish Energy Efficiency questions page.

Frequently asked questions
Why does MCS certification matter for a farm battery installation?
MCS certification indicates the installer meets recognised standards for design and installation. We install through MCS-certified partners, and your installer handles commissioning and DNO paperwork to current requirements.
Should I get more than one quote?
Yes. Getting two or three quotes is sensible. Compare what is included, not just the price: battery capacity, inverter type, backup capability, electrical upgrades and DNO paperwork should all be itemised.
What should an itemised quotation include?
It should list the battery, inverter, installation labour, electrical upgrades, backup circuit work, DNO application and any other costs, so you can see exactly what you are paying for before deciding.
Do I need a survey before getting a price?
Yes. A proper survey checks your supply, distribution board, existing solar, building layout and the loads you want backed up. Without a survey, any price is a guess.
What questions should I ask a farm battery installer?
Ask about MCS certification, experience with farm installations, whether the quote is itemised, what backup is included, who handles DNO paperwork, and what warranty the battery and inverter carry.
Reviewed by the Scottish Energy Efficiency team.
Last updated: